IT / EN...


.

ENG

ENG

As engineering company, our service includes: management consulting and feasibility studies – preliminary, executive and construction design – construction management and final commissioning tests.

EM/ESCo

EM/ESCo

To supervise energy services, to monitor and meter energy consumptions, to assist our clients’ Energy Managers, to promote new restoration/construction works on energy audits base, to research and raise new funds and performance the contracts.

PM

PM

To manage the entire project. The Project Manager is the key figure that coordinates the work, organizes the relations with the clients and manages all the operating aspects of the project, respecting the time schedule and costs.

  News

  News

  News

29/09/2016

Albero Diffuso Venissa

We have completed the installation of domotic and electrical system with remote management in the houses n. 6 – 17 – 25 – 42. From Mazorbo island the hotel Venissa can control and manage all system in the houses of Burano island. The works of the last one house, the n.32, are starting now.

Works developed:

  • Detailed Design and Construction Management of electrical and technological plants;
Hotel Venissa
.
.


20/09/2016

H Farm Campus

The new scholastic campus has just been inaugurated.
The structure was built in 2013 to the design of architect Mariano Zanon. Climosfera carried out the fit-out of MEP to adaptations for the training activities of the school.

Works developed:

  • Detailed Design and Construction Management of building A and B;
  • Specialistic consultancies to prepare all documents about Fire Safety.
H-Farm
.
.


14/09/2016

New Climosfera office in Nairobi

As part of the development policies of its business in East Africa (EAC), Climosfera opened its own branch in Kenya, with operational headquarters in
Runda Ruaka Road 71 – 00621 Nairobi (Kenya).
This choice is the result of the substantial increase of Climosfera’s development and operational activities within the Region. The main aim of it being to directly follow with its staff the on-going projects in the Region.

Nuova sede a Nairobi
.
.


12/09/2016

New Esaote S.p.a. headquarter

Climosfera is developing the project to relocate the productive unit of Esaote S.p.a. in the new building placed in Multedo street, Genoa.

Work in progress:

  • Detailed Design and Construction Management of technological plant;
  • Architectural Design of the interior elements.
Esaote S.p.a
.
.


08/09/2016

New A&O Hotel

Climosfera is developing the project for the construction of a building for tourism use placed in Corso del Popolo street, in Mestre (Venice).

Work in progress:

  • Detailed Design and Construction Management of MEP;
  • Specialistic consultancies to prepare all documents about Fire Safety and Acoustic.
A&O Hotels
.
.


  Costumers

  Partners