Eni Office in London

Climosfera developed the activity of Preliminary and Detailed Design about the installations of MEP, adapting facilities to the new architectural layout for the realization of the Office Building. Working in a high-density work stations office and facing the problems about the client’s activities we set up a network of absolute uninterruptible electrical power supplies with a centralized system as to guarantee continuity of service in case of power cut event. It was developed a particular soundproofing system for all the conference rooms and management offices. Design’s activity has been developed through a Building Infomation Modeling approach(BIM).

Project developed for Chapman Taylor & Associates


Location: London – United Kingdom
Building surface: 2.800 sqm
Estimated amount: 960.000 €
Period of activities: 2013/2014